Spray-Cooled™

Press Release: Systems Spray-Cooled Receives Contract from Nucor Steel Brandenburg

Systems Spray-Cooled™, of The Systems Group, was selected to supply the electric arc furnace (EAF) Spray-Cooled™ equipment to Nucor Corporation’s new plate mill in Brandenburg, KY.  The new EAF greenfield project includes equipment for a single EAF operation. 

2024-11-05T16:26:49-06:00December 6th, 2020|Spray-Cooled™, The Systems Group|

Press Release: Systems Spray-Cooled Delivers Equipment to Nucor Steel Gallatin

Systems Spray-Cooled Delivers Equipment to Nucor Steel Gallatin September 2020 Nashville, TN - Nucor Steel is expanding the steelmaking capacity at its flat-rolled sheet steel mill located in Ghent, KY.  As part of the expansion project, Nucor is adding a new 175-ton EAF that will increase the mill’s annual capacity from 1.6 million tons to

2024-12-23T16:11:51-06:00September 15th, 2020|Spray-Cooled™, The Systems Group|

Press Release: Systems Spray-Cooled Receives an Order to Upgrade Optimus Steel EAF

Systems Spray-Cooled Receives an Order to Upgrade Optimus Steel EAF July 2020 Nashville, TN -- Optimus Steel has placed an order for a furnace upgrade solution with Systems Spray-Cooled of The Systems Group.  The 4th quarter 2020 turn-key project includes a new Spray-Cooled™ Electric Arc Furnace (EAF) Roof, a new Spray-Cooled™ Elbow, the accompanying equipment that will replace

2024-12-23T16:10:24-06:00July 1st, 2020|Spray-Cooled™, The Systems Group|

Press Release: Systems Spray-Cooled Receives Order from Steel Dynamics, Inc.

June 2020 Nashville, TN - Systems Spray-Cooled has received an order from Steel Dynamics, Inc. for Spray-Cooled™ equipment at their new mill in Sinton, TX currently under construction.   The 2021 project includes equipment for their (2) Electric Arc Furnaces.  The Spray-Cooled™ equipment will cover 100% of SDI’s furnace cooling needs and will include the EAF

2024-12-23T16:37:05-06:00June 1st, 2020|Spray-Cooled™, The Systems Group|

The Systems Group Named a Top Specialty Contractor

Arkansas Company #350 in 2019 ENR Top 600 Specialty Contractors Ranking El Dorado, Ark., October 2019 – The Systems Group (tsg.bz), a leading specialty contractor serving the industrial market with a focus on steel mills, has been named one of the Top 600 Specialty Contractors nationwide in an annual ranking report released by Engineering News-Record (ENR), a

Press Release: Systems Spray-Cooled Receives Order from Europe for New Spray-Cooled™ EAF Roof and Elbow

Systems Spray-Cooled Receives Order from Europe for New Spray-Cooled™ EAF Roof and Elbow October 2019, Nashville, TN - Industeel Belgium sa (“Industeel”) has placed an order for a new Spray-Cooled™ Electric Arc Furnace (EAF) Roof and Elbow with Systems Spray-Cooled. The 2020 design-build project includes a new EAF Roof, Elbow, engineering, laser scans, and accompanying

2024-12-26T12:11:21-06:00October 15th, 2019|Spray-Cooled™, The Systems Group|

Press Release: The Systems Group is Making a BIG Economic Impact in Southern Arkansas

The Systems Group is Making a BIG Economic Impact in Southern Arkansas April 3, 2018, El Dorado, Arkansas - The Systems Group (TSG) is making a BIG difference in their hometown, manufacturing Spray-Cooled™ furnace equipment used in the steel-making industry, one that in turn drives our national economy.  TSG was started in El Dorado in

2024-12-26T12:48:34-06:00April 2nd, 2018|Fab & Machine, Spray-Cooled™, The Systems Group|

Press Release: Ovako Hofors Puts Safety at Forefront with First Spray-Cooled™ EAF Roof in Nordic Region

Ovako Hofors Puts Safety at Forefront with First Spray-Cooled™ EAF Roof in Nordic Region July 24, 2017, El Dorado, Arkansas – Swedish steel producer Ovako has awarded Systems Spray-Cooled the contract to modernize and increase safety on their Electric Arc Furnace (EAF) with the first Spray-Cooled™ roof in the Nordic region, located at their bar,

2025-01-07T16:03:58-06:00July 24th, 2017|Spray-Cooled™, The Systems Group|

Systems Spray-Cooled News Flash: AIST Jan Front Cover, Safety First Article, & NYS Technical Article

Front Cover: Initial EAF Heat at Big River Steel of Osceola, AR Systems Spray-Cooled is proud to announce the appearance on the front page of the January 2017 AIST Iron & Steel Technology industry magazine. On the cover is Spray-Cooled's newest 165-ton furnace going into service at Big River Steel in Osceola, AR. Congratulations to

Systems Spray-Cooled Makes January 2016 AIST Front Cover

Systems Spray-Cooled Makes January 2016 AIST Front Cover El Dorado, Ark., January 15, 2016 –Systems Spray-Cooled is proud to announce the appearance on the front page of the January 2016 AIST Iron & Steel Technology industry magazine.  On the cover is a new single-bucket charge upper and lower electric arc furnace shells (6,500 ft3/184 m3) going into

Go to Top