

Cartersville, GA
Project: Install all Piping Systems and Associated Equipment for a New Finishing Mill Bundler/Stacker at Birmingham Steel in Cartersville, Georgia.
Seguin, TX
www.cmcsteeltexas
Project: Excavation, Formwork, and Concrete Placement for Spare Furnace Shell Repair Station
Project: Installation of Water and Utility Piping for Caster
Ghent, KY
www.corefurnace.com
Project: Mechanical and Piping Installation of Walking Beam and Rotary Hearth Furnaces at North American Stainless.
Memphis, TN
Project: Install all Piping Systems and Associated Equipment for New Greenfield Birmingham Steel Mill in Memphis, Tennessee
Ghent, KY
Project: Install Utilities, and Service and Process Piping at EAF, Caster, Reheat and Roll Mill for Gallatin Steel Facility at Ghent, Kentucky.
Ghent, KY
Project: Interconnecting Process and Utility Piping for a New Melt Shop and Water Treatment Plant and Pumping System for North American Stainless at Ghent, Kentucky.
Project: Interconnecting Process Piping for a State of the Art Stainless Steel Strip Degreasing Section in the Pre-Cleaning Segment of a New Stainless Steel Strip Pickling Line at North American Stainless at Ghent, Kentucky
Axis, AL
www.swedishsteel.com
Project: Mechanical Installation of Plate Side Trimmer
Ghent, KY
www.northamericanstainless.com
Project: On going plant maintenance since October 2001.
Project: Installation of Natural Gas, Water, Instrument Air, and Compressed Air Piping for New Sendzimir Mill; Work also Included Setting of Pumps, Valve Stands, and Cooling Tower.
Project: Installed Piping Systems Including Hydraulics, Lube Oil, Grease, Mold Water, Machine Water, Spray Water, Natural Gas, Oxygen, Argon, Nitrogen, Compressed Air, Potable Water, and Emergency Water for New Danieli Billet Caster. Work also Included Flushing and Cleaning of Piping Sytems.
Project: Equipment and piping installation for new DeNox equipment to support #3 Annealing/Pickling Line
Project: Fabricated and installed structural steel for new annealing/pickling building. Work included erection of approximately 800 tons of structural steel, roof decking, and crane rail installation/alignment
Project: Fabrication & Erection of Structural Steel, roof decking, and crane rails for new Danieli Billet Caster
Project: Installation of piping for degreasing section of pickle line
Armorel, AR
www.nucoryamato.com
Project: Process Piping and Equipment Setting for Original Construction of Mill
Project: Detail Engineering and Installation of Yard Piping, instrument Air, Dust Conveying to Tie-In New Canapy Baghouse with Existing Baghouse System
Project: Ongoing Plant Maintenance
Cofield, NC
www.nucorhertford.com
Project: Process Piping, Utility Piping, Steel Erection and Equipment Setting for Original Construction of Mill
Project: Ongoing Maintenance
Crawfordsville, IN
http://www.ns-ind.com/
Project: Process Piping, Utility Piping, Steel Erection and Equipment Setting for Original Construction of Mill
Project: Numerous Expansion Projects and Ongoing Maintenance
Project: Piping for New Cast Strip Equipment and Associated Building
Project: Piping for New Tilting Annealing Furnaces, Associated Utility Piping Modifications, and Structural Support Revisions Needed for Two New Annealing Furnaces.
Project: Ongoing Maintenance
Darlington, SC
www.nsbar.com
Project: Process Piping and Utility Piping for Original Construction of New Melt Shop
Hickman, AR
www.nucorar.com
Project: Utility and Process piping for a "Greenfield" steel mill including fire protection , underground and rack utilities, Cooling towers, Pump Houses, Sand Filters, Clarifiers, for two (2) DC Arc Furnaces, Twin Station LMF, Continuous Strip Caster, Roller Hearth Reheat Furnace, Shipping Building, as well as miscellaneous concrete and steel structures.
Project: Process Piping and Miscellaneous Steel for New Pickle Line, Cold Reversing Mill and Galvanizing Line
Project: Ongoing Maintenance
Huger, SC
www.nucor-sheetmills.com/
Project: Process Piping, Utility Piping, Steel Erection and Equipment Setting for Original Construction of Mill
Project: Numerous Expansion Projects and Ongoing Maintenance
Jewett, TX
www.nucorbar.com
Project: Piping for the replacement of Texas II Roll Mill equipment included demolition of existing piping for original equipment, as well as the engineering, design, fabrication, and installation of new piping for new mill stands, shears, and Roll Shop.
Project: Piping for the replacement of Texas I Roll Mill equipment included demolition of existing piping for original equipment, a swell as the engineering, design, fabrication, and installation of new piping for mill stands, motors, shears, cooling bed, stacker, bundler, and cooling water systems.
Project: Piping for new equipment for combined contact water system equipment installation including sand filters, cooling towers, pumps, strainers, and distribution system.
Project: Piping for new Core Reheat furnace for Texas I
Project: Piping design, fabrication, and installation for new Melt shop equipment including utility services, cooling towers, pumps, Baghouse, Electric Arc Furnace, Twin LMF’s, water for new Billet Caster.
Project: Mechanical assembly and erection of equipment and combustion & fuel gas piping for a new Bendotti Pusher Reheat Furnace.
Project: Replacing vendor supplied piping for several items of mechanical equipment.
Kankankee, Illinois
www.nucorbar.com
Project: Installation of Piping Sytems for New Reheat Furnace, Flushing and Cleaning of Piping Systems, and Installation of Support Utilities.
Norfolk, NE
www.nucorbar.com/
Project: Complete Responsibility for All Process Piping and Utility Piping During Original Construciton of New Melt Shop. Piping for New Walking Beam Reheat Furnace.
Plymouth, UT
http://www.nsutah.com/
Project: Process & Utility Piping for Various Mill Improvements
Memphis, TN
www.nucorbar.com
Project: Detail Engineering for piping systems and installation of piping for water systems, EAF, Caster, Reheat Furnace and Roll Mill
Point Lisas, Trinidad & Tobago, West Indies
www.nucor.com
Project: Piping and Ancillary Equipment Installation for Re-erection of Midrex Process Direct Reduced Iron Facility. Work Includes all Process Piping Systems, Site Utilities, and Fire Protection Systems.
Blytheville, AR
www.nucor.com
Project: Installation of Process and Water Piping for New Caster, LMF, and Vacuum Degasser
El Dorado, AR
www.chemtura.com
Project: Installation of Safety Platforms and Miscellaneous Piping for Maintenance
Project: Equipment Installation with Associated Structural Modifications and Piping for New Unit for PDBS Expansion.
Project: Fabrication and Erection of Structural Steel, Siding, and Equipment Setting for New Process Chemical Unit
El Dorado, Arkansas
www.eldoradochemical.com
Project: Installation of Foundations, Equipment, Structural Steel, and Piping for New Mixed Acid Unit,E2 Scrubber, Tank Farm, and Associated Truck Loading/Unloading. Equipment Installation Included Modifications and Setting as Required for Tanks (4), Heat Exchangers, Pumps, Load Racks, and Ancillary Equipment. Structural Steel included Fabrication and Erection of New Process Structure and Associated Pipe Racks.
Project: Foundations for New Nitric Acid Plant
Point Comfort, TX
www.fpcusa.com
Project: Erection of 1,750 Tons of Structural Steel
Chemung, NY
www.vulcraft.com/
Project: Process Piping & Utility Piping for New Joist & Deck Facility
Ft. Payne, AL
www.vulcraft.com/
Project: Process Piping & Utility Piping For New Deck Facility
Blytheville, AR
www.tmk-group.com/ipsco_blytheville.php
Project: Equipment Setting, Process Piping and Utility Piping for 300,000 Ton/Year ERW Pipe and Tube Mill
Project: Installation of Furnace, Associated Piping and Refractory for New Temper Furnace.
Project: Ongoing Site Maintanence
Hickman, AR (formerly Maverick Tube)
www.tenaris.com
Project: Fabrication, Machine Works & Plant Maintenance
Smackover, AR
www.crossoil.com/
Project: Fabrication and installation of piping, equipment setting, and associated ASME code work to existing tower and vessels
Project: Fabrication and installation of pipe rack, setting/alignment of pumps, fabrication/installation of lube oil, steam and N2 piping for Tank Farm Expansion.
Project: Foundations and building erection for new 120,000 SF Warehouse and Associates Truck Loading Dock
Project: Form and pour tank farm for twenty-seven (27) Packaging tanks, set and anchor tanks
El Dorado, AR
www.lionoil.com
Project: Supply Craftsmen to Supplement Plant Maintenance
Osceola, AR
www.ihi.co.jp
Project: Fabrication ,Machining and Installation of Boiler Casings, Miscellaneous Structural Steel, Platforms, Handrails, Dampers, and Piping.
Jenks, OK
www.snclavalin.com
Project: Miscellaneous Foundations at 650 MW Power Plant
Steens, MS
www.snclavalin.com
Project: Fabricate, Paint, Machine and Install Twelve Torque Tubes for 813 Mega Watt Power Plant.
Sterlington, LA
www.snclavalin.com
Project: Install Miscellaneous Sumps, Foundations, and Sound Wall Bases
Project: Fabricate, Paint, Machine and Install Twelve Torque Tubes for 835 Mega Watt Power Plant.
Project: Fabricate Structural Steel, Erect Structural Steel and Sheet Two Turbine Buildings
Southaven, MS
www.snclavalin.com
Project: Labor, Supervision, Materials, Tools & Equipment to Repair the Acoustical Baffles in Three Heat Recovery Steam Generators (HRSG) at 820 Mega Watt Power Plant in Southaven, MS.
Project: Fabricate, Paint, Machine and Install Twelve Torque Tubes.
El Dorado, AR
www.amercable.com
Project: Installation of Equipment for 2008 Expansion Including South Six Drum Cabler/Spooler and Pourtier Cablers with Associated Foundations, Structures, and Piping
Project: Engineering, Auger-Cast Piling, Dirtwork, Foundations, Slabs, Plumbing, Fire Protection System, and Building Erection for New 114,500 SF Building Expansion
Project: Relocation of Equipment with Associated Foundation, Structure Work, and Piping
Project: Engineering, Auger-Cast Piling, Dirtwork, Foundations, Plumbing, Electrical, Fire Protection and Building Erection for 54,000 SF Warehouse Expansion
Project: Installation of New Vulcanizer and Leads Press including Auger Cast Piles, Concrete Foundation and Sumps
St. Joe, IN
www.nucor-fastener.com
Project: Assembly And Installation Of Annealing Furnaces And Associated Piping
Arcadia, LA
www.arcadiagasstorage.com
Project: Installation of Foundations, Structures, Equipment and Piping for Compressor Station
Project: Construction and Installation of the 12" Regency Interconnect between Arcadia Gas Storage and Regency M&R Station
www.bwpmlp.com
Tallulah, LA
Project: Installation , Testing and Pre-Commissioning of Nine (9) bays of Gas Coolers with Associated Civil, Piping and Electrical Work.
Mira, LA
Project: Grassroot Compressor Station to Compress 1.3 Billion Cubic Feet of Natural Gas Day per Day. Site Work, Foundations, Equipment Installation, Buildings, Roads, Piping, and Electrical Work for New Compressor Station
Harrisville, MS
Project: Installation , Testing and Pre-Commissioning of Nine (12) bays of Gas Coolers with Associated Civil, Piping and Electrical Work.
Waldo, Arkansas
www.deltic.com
Project: Concrete foundations and area paving; conveyor installation and modifications for new boiler installation, demo of dearator and work at Kilns; installation of new edge trimmer with associated structural steel and foundation work.
El Dorado, AR (formerly Teris, LLC)
www.cleanharbors.com
Project: Modifications of Structural Steel with Associated Electrical and Piping Relocation to Accommodate a Fire Sprinkler System.